
LINDEN TRANSLOAD TERMINAL |
|
| 4901 Tremley Point Road | |
| Linden, NJ 07036 (map) | |
| Modes Inbound | Rail, Vessel, Barge |
| Modes Outbound | Barge, Truck, Pipeline (future) |
| Railcar Capacity | 280 Loaded / Empty |
| Servicing Railroads | Norfolk Southern Railroad, CSX Railroad, Conrail |
| Storage Capacity | 550,000 barrels |
| Vessel Berth | 36’ MLW Draft, 715 ft in length |
| Barge Berth | 27’ Draft, 405 ft in length |
| Terminal Services | Automated Truck Rack |
| Railcar Unloading | |
| Barge Loading / Unloading | |
| Vessel Unloading | |
| Marine offloading and denaturing | |
| Corrosion inhibitor additization | |
| Marine Vapor Recovery (10,000 barrels per hour) | |
| Major Features | Unit train terminalling (80 railcar trains) |
| Automated card / key multi-lane high speed truck loading with customer allocation system | |
| Dedicated / segregated storage and pipeline system | |
| Inventory management with State of the Art Environmental Controls | |
| Dual berth loading / unloading with multiple manifold configuration | |
| Expandability to nearby terminals via pipeline connectivity | |


